Complete roofing for new construction, coordinated with your build schedule and engineered for Northwest weather.
Roofing a new build requires precise coordination with framing, weatherproofing, and inspection milestones. We install the full roof system, from underlayment and flashing to the finished material, in step with your construction timeline. Ventilation and moisture management are designed in from the start to suit our rainy regional climate. Working to plan specs and code, we deliver a roof that protects the structure as the rest of the build proceeds.
Coordinated with your build timeline; Engineered ventilation from the start; Proper flashing and moisture management; Installed to plan specs and code; Protects the structure during construction
1) Review the roof plans and framing readiness; 2) Install underlayment and flashing systems; 3) Apply the specified roofing material; 4) Complete inspection-ready detailing
Roof size, pitch, and design complexity; Specified roofing material; Ventilation and flashing scope; Coordination with the build schedule; Site access
Aligning the roofing phase with the drier months keeps the structure protected and on schedule.