Strong Foundations. Superior Results.
Complete roofing for new construction, coordinated with your build schedule and engineered for Northwest weather.
You are building a new home in Roy, and the roof is the part that has to keep the weather out from the first storm. You want to know it will be installed correctly before the walls and interior are closed in.
New construction roofing is different from a replacement. There is no old roof to tear off, so the work follows the framing, the sheathing and the schedule of the build. Washington Construction gives a 1-year warranty on labor. This page explains what shapes a roof here and what to expect.
A new roof has one main job: move water off the house and keep it out of the structure. Most roof problems start at the edges and openings, such as eaves, valleys, vents and chimneys. Flashing and underlayment at those spots matter as much as the shingles or panels on top.
Rain is the biggest local factor. Roy sees about 117 days a year with 0.1 in or more of rain, based on Daymet data from 2005 to 2025. That is a lot of wet days. For a new build, it means the framing and sheathing can sit exposed for part of the schedule. Getting the roof dried in promptly, with underlayment over the sheathing, helps protect the lumber and the work below it. It also makes sense to plan roofing around the weather instead of fitting it in wherever the calendar lands.
Snow is a smaller concern. Roy averages 6.2 in of snowfall per season. That is not a heavy load, but it still affects choices such as roof pitch, how snow and meltwater leave the roof, and how the eaves are detailed. Cold, wet weeks can also slow installation, since some materials and sealants work best within certain temperature ranges.
Because Roy is a small town of about 275 homes, there are too few homes for reliable Census percentages. We will not guess at the age or condition of nearby houses. Your roof should be planned around your own plans, your lot and your builder or inspector requirements.
The work itself usually follows a set order:
Washington Construction backs its labor with a 1-year warranty. Ask for the scope in writing, including the materials, the flashing details and who is responsible for coordinating with the other trades.
A very small city on the prairies of rural south Pierce County.
Coordinated with your build timeline; Engineered ventilation from the start; Proper flashing and moisture management; Installed to plan specs and code; Protects the structure during construction