Strong Foundations. Superior Results.
A tile shower installation surrounds your bathing space in custom, waterproof tilework.
A tile shower is an interior job, so it can be done in any season. Still, the wet months make a good fit. Wilkeson sees about 142 days a year with 0.1 in or more of rain (Daymet, 2005-2025), so outdoor projects often get pushed aside for long stretches. Work inside the bathroom is not held up by weather in the same way.
This page explains how to plan a tile shower installation, what changes the scope, and what to expect once work starts. Washington Construction, based in Bothell, WA, offers this service for homeowners in Wilkeson.
Start with the shower you have now. Is it a tub-shower combination, a fiberglass stall, or an older tiled unit? Each one leads to a different amount of demolition. Decide early whether you want the same footprint or a new layout, because moving the drain or valve changes the plumbing work.
The biggest unknown is what sits behind the old surface. Once walls are opened, crews may find water damage, soft framing, or old materials that need to be replaced before any tile goes up. That is common in any bathroom with a long-used shower, and it can widen the job.
Other choices shape the work too. Tile size and pattern, a built-in niche or bench, glass or a curtain, and the type of floor pan all add or remove steps. Small mosaic tile on a shower floor takes more setting time than large format pieces. Large tile needs flatter walls, which can mean more prep.
Wilkeson has about 43 days a year that freeze at night and thaw by day (Daymet). If the bathroom is on an exterior wall or in a space that is not heated all winter, that cycle is worth mentioning. Cold walls and unheated rooms can slow curing of setting materials, so heat in the room matters during the work.
Expect demolition first, then any plumbing and framing repairs, then waterproofing, then tile and grout. Waterproofing and curing steps need time to set between stages, so the shower will not be usable for a while. Plan on using another bathroom, or make other arrangements, until the work is finished.
Washington Construction gives a 1-year warranty on labor. Ask for the details in writing before you sign.
One practical tip: pick your tile, fixtures, and glass before demolition begins. Having materials on site avoids gaps in the schedule and lets the installer check that the valve depth and wall layout match what you chose.
A very small historic coal and sandstone town in the foothills of southeast Pierce County.
Delivers a fully custom, personalized look; Provides a waterproof, long-lasting surface; Allows accent bands, niches, and patterns; Withstands heavy moisture and hard water