Strong Foundations. Superior Results.
Waterproof bathroom flooring installation designed to withstand constant moisture, steam, and splashes.
Bathroom flooring is an interior job, so it can be done in any season in Normandy Park. Many homeowners pick the wetter months, when outdoor projects slow down and the bathroom is the room they want to improve. Planning ahead matters more than the calendar, because the floor can't be used while it is being replaced.
Washington Construction, based in Bothell, WA, installs bathroom flooring. This page explains how to plan the job, what changes its scope, and what to expect once work begins.
Start by deciding how far the work should go. Some bathrooms only need new surface flooring. Others need the old layers pulled up first, and that is when the real condition of the subfloor shows.
Per the Census ACS 2020-2024, about 80% of housing units in Normandy Park were built before 1980, and that figure includes apartments. Only about 9% were built between 1990 and 2009. That is a local statistic, not a statement about any one house. Still, if your home is older, plan for the possibility that the floor has older materials under the current surface. Homes built before 1978 may have lead paint, and older flooring layers can contain materials that need careful handling. It is better to ask about this before demolition than during it.
Several things change the size of the job:
The subfloor matters most. Bathrooms see moisture, and a soft or stained subfloor has to be repaired before new flooring goes down. The floor must also be flat and solid, or tile and plank products will not sit correctly. Fixtures count too. If the toilet and vanity must be removed and reset, that adds steps. Transitions to the hallway and the height of the new floor against the door also need thought.
Expect the work to run in order: removal of the old floor, subfloor check and repair, preparation, installation, and finishing details. Some materials, such as tile set in mortar or grout, need time to cure before the room can be used normally. Your bathroom may be out of service for part of that time, so think about where the household will manage in the meantime.
About 83% of occupied homes in Normandy Park are owner-occupied, per the Census. If you own your home, you decide on materials and scope yourself, which makes a clear plan up front worthwhile. Financing is available, subject to credit approval, if you want to spread the cost of a larger scope.
Practical tip: choose a floor with a slip-resistant surface and decide on it before demolition begins, so the subfloor work and the finished height are planned around the material you actually want.
A quiet residential city on the Puget Sound shoreline in south King County.
Fully waterproof against splashes and steam; slip-resistant options for safety; resists mold and mildew growth; easy to clean and sanitize