Strong Foundations. Superior Results.
Fully synthetic PVC decking that offers the ultimate moisture defense for rainy Puget Sound yards.
For a PVC deck in Mountlake Terrace, the best window is usually the driest part of the year. July is the driest month on average here, so late spring through summer gives the framing and decking the best chance of going in without constant rain delays.
Washington Construction, based in Bothell, WA, installs PVC decks. This page explains how to plan the job, what shapes its scope, and what to expect once work starts. Planning in the off-season can help you be ready when the dry weeks arrive.
Mountlake Terrace sees about 107 days a year with 0.1 inch or more of rain, per Daymet data for 2005 to 2025. That is a lot of wet days. Rain slows excavation, footing work and framing, and it can leave lumber and the work area soaked. It makes sense to settle design, material choices and layout well before you want to build, so the work can start when the weather turns dry.
Tree canopy covers about 29.6% of Mountlake Terrace, according to USFS and NLCD data for 2025. If your yard has mature trees near the deck site, expect shade, damp surfaces and falling debris. PVC decking does not rot the way wood can, which is one reason people choose it for shaded, damp spots. It still needs to be kept clean. Leaves, needles and moss can leave a slick film on any deck surface.
Trees also affect the build itself. Roots can limit where footings go. Overhanging branches can limit access for materials and equipment. Pointing these out early helps shape the deck size, shape and height.
Other things that set the scope include the height off the ground, the stairs and railings, and the condition of any existing deck that has to come out first. Your site walk should cover each of these.
The job generally runs in steps: removal of any old deck, layout and footings, framing, decking, then rails and trim. Weather can shift the order or the pace, especially outside the dry months. Washington Construction gives a 1-year warranty on labor, so ask for the terms in writing with your agreement.
Walk your yard on a rainy day before the design is final. See where water pools, where the shade falls and which spots stay damp. Share those notes at the site visit so the deck layout and drainage can fit what the yard actually does.
A residential city in southwest Snohomish County near the King County line.
One hundred percent synthetic core is impervious to rot and moisture; Lighter weight than composite for easier spans; Excellent stain and fade resistance; Stays cooler than many composites in direct sun; Ideal for shaded, moss-prone Northwest lots