Strong Foundations. Superior Results.
We install LP SmartSide engineered siding, treated to withstand the moisture, fungus, and pests common to Puget Sound.
In Gold Bar, about 154 days a year bring 0.1 inch or more of rain, based on Daymet data for 2005 to 2025. For an LP SmartSide installation, that matters before the first panel goes up. Wet siding, wet framing and open wall layers do not mix well.
Washington Construction, based in Bothell, WA, installs LP SmartSide siding on homes in Gold Bar. This page explains how the work goes, and how the local rain pattern should shape your planning and your schedule.
Daymet data for 2005 to 2025 shows that about 81% of Gold Bar's yearly precipitation falls from October to April. That is the main scheduling fact for your project. Siding work exposes the wall for a time, so the season you choose affects how much weather protection the job needs.
The steps are straightforward. Your siding is installed in a sequence that keeps the wall covered as work moves along.
With rain on about 154 days a year, you should expect some weather to affect the schedule. Dry stretches are the best time for steps that leave the wall open, such as tear-off and barrier work. Painting and caulking also need suitable conditions. Ask how your contractor plans to protect exposed areas if rain moves in mid-job.
Because most of the precipitation falls from October to April, the drier months give more room for exterior work. That does not mean winter work is impossible. It means the plan should allow for delays and good covering of open walls.
Gold Bar is a small town of about 870 homes, so there is too little data to draw reliable Census conclusions about local housing. Your own house is what counts. A careful look at the wall behind the old siding will tell you what repairs are needed.
Financing is available, subject to credit approval, if you want to spread out the cost of the project. Use the contact section on this page to ask about a scope for your home.
A small town along the Skykomish River and US-2 in the Cascade foothills.
SmartGuard treatment resists rot, fungus, and termites; Impact-resistant against hail and debris; Long prorated substrate warranty; Pre-primed for excellent paint adhesion; Lighter and easier to work than fiber cement