Strong Foundations. Superior Results.
Fully synthetic PVC decking that offers the ultimate moisture defense for rainy Puget Sound yards.
July is the driest month in Carbonado on average, which makes late spring through summer a sensible window to build a PVC deck. Framing and decking go down more cleanly when the site is not soaked, and boards are not sitting in mud.
Washington Construction, based in Bothell, WA, installs PVC decks and gives free estimates. This page covers how to plan the job, what shapes its scope, and what to expect once work starts.
Start with the weather. Carbonado sees about 144 days a year with 0.1 inch or more of rain, based on Daymet data from 2005 to 2025. That is a lot of wet surface. PVC decking does not rot, which is a real advantage here, but the framing under it still needs to be built and protected with care. Planning your build for the drier months gives the structure a better start.
Tree canopy covers about 36.5% of Carbonado, per USFS/NLCD 2025. If your yard is shaded, expect needles, leaves and damp conditions on the deck surface. That shapes several choices. Board spacing, surface texture and drainage details all matter more under trees. Shade also means slower drying, so moss and algae can build up on any decking material. PVC is easier to clean than wood, but it still needs regular sweeping.
Other things will change the scope too:
The size and height of the deck, the condition of any existing deck being removed, the slope of the yard, and the railing and stair layout all affect the work. Access for equipment and material delivery matters as well. A deck tucked behind trees may take more hand carrying.
The job usually begins with a site visit and measurements. Existing structures come out if there are any. Footings and framing follow, then the PVC boards, fascia and railings. PVC expands and contracts with temperature, so installers leave gaps and follow the manufacturer's fastening rules. Ask how those gaps will be handled on your deck.
We do not state permit requirements here, since none apply to this page. Ask during your estimate what approvals your specific deck may need, and confirm them with the local permitting office before work is scheduled.
One practical tip: before the estimate visit, walk your yard on a rainy day and note where water pools and where shade lingers. Those two observations help shape the framing, drainage and board choices on your deck.
A very small former coal-mining town in the foothills of southeast Pierce County.
One hundred percent synthetic core is impervious to rot and moisture; Lighter weight than composite for easier spans; Excellent stain and fade resistance; Stays cooler than many composites in direct sun; Ideal for shaded, moss-prone Northwest lots