Strong Foundations. Superior Results.
We pour monolithic and reinforced slab-on-grade foundations that give additions and homes a solid, ground-level base.
Slab foundation work makes the most sense in Carbonado during the drier months, usually late spring through early fall. Concrete needs a stable, workable site, and Western Washington rain can turn an excavated pad into mud. Wet weather also slows curing and finishing.
Washington Construction, based in Bothell, WA, installs slab foundations for new homes, additions and outbuildings. This page explains how to plan a slab in Carbonado, what shapes the scope, and what to expect once work begins.
FEMA's National Risk Index rates inland flooding risk for Carbonado as Relatively High. That is a risk rating, not a prediction for any one lot. It still matters for a slab, because a slab sits close to the ground. Before design, look at how water moves across your property, where the nearest drainage runs, and how high the finished floor should sit above the surrounding grade.
Several site conditions change the work:
Soil type and drainage decide how much excavation, gravel base and drainage work the slab needs. A sloped lot may need grading or retaining work before forming starts. The size and use of the building matter too. A house slab, a garage slab and a shop slab can call for different thickness, reinforcement and edge details. Plumbing and other utilities that run beneath the floor must be placed before the pour, so layout decisions come early.
FEMA rates earthquake risk for Carbonado as Relatively Moderate. Again, this is a risk rating. It is a reasonable reason to ask how the slab will be reinforced and tied to the framing above it, and to have those details reviewed during design.
The sequence is usually site preparation and excavation, then compacted base, forms, underslab plumbing, reinforcement, the pour and finishing. Concrete then needs time to cure before framing loads are added. Weather can shift the schedule, so build some flexibility into your plans, especially if the pour falls near the edges of the dry season.
Washington Construction is licensed, bonded and insured ($2M). Ask any contractor you consider to confirm the same in writing.
Practical tip: walk your lot after a heavy rain and note where water pools or runs. Share photos or notes with your contractor before design is finalized. It is simple information, and it helps set the slab height and drainage plan.
A very small former coal-mining town in the foothills of southeast Pierce County.
One integrated pour that serves as footing and floor; Vapor barrier that blocks ground moisture from the slab; Reinforcing steel placed for crack control and strength; Thickened edges sized for concentrated loads; A flat, durable surface with no crawlspace upkeep