Strong Foundations. Superior Results.
A durable, fully equipped outdoor kitchen designed to cook and entertain through every Puget Sound season.
In Burlington, outdoor kitchen work makes the most sense when the ground is dry enough to dig and pour. Daymet records show about 107 days a year here with 0.1 in or more of rain (2005-2025). That is a lot of wet days to work around, so planning in the off-season and building in the drier months is a sound approach.
This page explains how we plan an outdoor kitchen, what changes the scope, and what you can expect once work starts. Washington Construction has been in business for 22 years.
Start with the site. Where the kitchen sits decides how far gas, water, and power must run, and how the slab or base needs to be built. A spot close to the house usually means shorter runs. A spot farther out means more trenching and more work.
Rain matters here. With about 107 days a year at 0.1 in or more of rain, per Daymet data for 2005-2025, exterior work is often paused or reordered. Footings, concrete, and masonry need workable conditions. Cabinets and countertops outdoors also need a plan for drainage and cover, so water does not pool around appliances or soak the base. A roof or pergola over the cooking area is worth discussing early.
The main drivers are size, utilities, and materials. A simple grill island is a different job from a kitchen with a sink, refrigerator, and covered seating. Each added appliance adds utility work. Stone, tile, and stainless steel hold up outdoors, but they differ in weight and in the base they need.
Your house age can matter too. Census ACS 2020-2024 data shows about 40% of Burlington housing units were built from 1990 to 2009, and about 36% were built before 1980, which includes apartments. If your home is older, tying into existing electrical or gas lines may mean checking what is already there before we settle the design. Homes built before 1978 may also have lead paint, which is worth knowing if the kitchen will attach to an exterior wall.
Expect a site visit, a design discussion, and a scope that lists the utilities, base, structure, and finishes. Work usually runs in stages: layout and groundwork first, then utilities, then the structure and surfaces, then appliances. Weather can shift the order of those stages.
Practical tip: decide on your appliances before the base is built. Their sizes and hookups set the cutouts and utility locations, and changing them later is harder once the base is poured.
A city in the Skagit River valley known as a regional retail center.
Brings cooking and hosting into the backyard; Weather-rated materials handle constant moisture; Adds a high-value feature buyers notice; Reduces trips indoors during gatherings; Customized layout around grill, sink, and fridge