Hands-on permit assistance that navigates Western Washington’s building departments so your project stays legal and on track.
This page is for Yarrow Point homeowners planning work that needs a building permit, whether it is a remodel, an addition, or a larger rebuild. It is also for owners who have never filed with a small town and are unsure what the Town expects.
Washington Construction, based in Bothell, WA, prepares and files the permit application for permitted work. Below we compare the ways you can handle the paperwork and what Yarrow Point's process means for each. We give free estimates.
You have two realistic choices: file the permit yourself, or have your contractor prepare and file it. Each can work. The right one depends on your project and how much time you have.
Yarrow Point handles building permits in-house through the Town. It is not on MyBuildingPermit.com, so you will not find the usual online portal. Applications go by email to [email protected]. Per the March 2026 Building Permit Package, you send the completed application, plans and documents together. Fees are due at submittal.
That makes self-filing workable for a homeowner who is organized and has finished plans. The risk is an incomplete package. Because fees are due when you submit, you want the application, plans and documents ready before you send anything.
We prepare and file the permit application for permitted work. This suits projects where plans, scope and permit paperwork need to match, since the same team that will build the job is assembling the package. It also suits owners who would rather not learn a town-specific email process for a one-time project.
One rule can change your schedule. A pre-application meeting is required if the project value is over $50,000. If your project may pass that line, plan for the meeting before the application goes in. Settle the scope early so you know which side of the line you are on.
Yarrow Point sees about 108 days a year with 0.1 inch or more of rain, per Daymet data for 2005 to 2025. For exterior work, that is a reason to get the permit moving early. Waiting on paperwork can push construction into wetter months, when roofing, siding and foundation work are harder to schedule.
Quick way to decide:
A small residential town on a peninsula in Lake Washington near Bellevue.
Applications prepared correctly the first time; Familiarity with local jurisdiction requirements; Direct communication with building officials; Reduced risk of costly permitting delays; Confidence that your project is fully legal