Strong Foundations. Superior Results.
Installing moisture-tolerant bathroom vanities and cabinets built to endure the humidity of daily use.
Bathroom cabinet installation is mostly interior work, so it can be scheduled in any season. In South Prairie, the wetter months make a good fit. Daymet data for 2005-2025 shows about 136 days a year with 0.1 in or more of rain, which is a lot of days when outdoor projects get pushed back.
Washington Construction, based in Bothell, WA, has been in business for 22 years. This page explains how to plan a vanity or bathroom cabinet install, what changes the scope, and what to expect once work starts.
Start with the room, not the cabinet. Measure the wall, the plumbing locations and the door and drawer swing. A vanity that looks right in a showroom can block a door or crowd a toilet once it is in place.
A simple swap of one vanity for another of similar size is a smaller job. Scope grows when the new cabinet is a different size, when the sink or faucet moves, or when the plumbing has to be changed to match. Wall and floor condition matter too. If the wall behind the old vanity is damp, soft or out of plumb, it needs attention before new cabinets go in. Wall-hung cabinets and tall linen cabinets also need solid backing in the wall to carry the weight.
Countertop and sink choice affect the plan as well. Some tops are cut to fit a specific cabinet, so order and cabinet size need to line up. Decide on the faucet early, because the holes in the top and the cabinet back need to match it.
South Prairie sees about 37 days a year that freeze at night and thaw by day, per Daymet. That matters mainly for delivery and storage. Wood cabinets and tops can swell or shift with big swings in moisture, so they should come into the house and sit in a dry, heated space before install. Wet days also mean wet boots and floors, so protect the path from the door to the bathroom.
Typical steps are removing the old unit, checking the wall and floor, setting and leveling the new cabinet, fastening it to the studs, then connecting the top, sink and plumbing. The bathroom will be out of use for part of that time, so plan for another bathroom if you have one.
Practical tip: keep the old vanity in place until the new cabinet has arrived and you have checked it for damage and size. That way you are never without a working sink while a wrong or damaged box gets sorted out.
A very small town in the foothills of southeast Pierce County near the Carbon River.
Sturdy, level vanity and cabinet installation; Sealing that guards against moisture damage; Clean plumbing cutouts and connections; Added, organized bathroom storage; Finished look matched to your remodel