Strong Foundations. Superior Results.
Custom homes engineered for shoreline lots along Puget Sound, lakes, and rivers.
Waterfront building in Shoreline is best planned in the drier months, roughly late spring through early fall. Wet-weather months slow exterior work, and open foundations and framing near water do not mix well with steady rain. Planning and permit work can happen over the winter so you are ready when the weather turns.
Washington Construction, based in Bothell, WA, has been in business for 22 years. This page explains how to plan a waterfront home build in Shoreline, what shapes the scope, and what to expect along the way.
Shoreline has more than one kind of waterfront. The Census map shows salt water, Lake Ballinger and Lake Washington within 1 km of the city limits. Your lot's exact setting matters, because salt water, a small lake and a large lake can each bring different site conditions.
About 28.5% of Shoreline's land is within 1 mile of salt water. That tells you waterfront living is a real part of the city, but it says nothing about your lot. Before design begins, learn where your property sits relative to the water, how the ground slopes toward it, and how drainage moves across the site. These points shape the foundation, the access for equipment and the layout of the house.
Scope usually comes down to a few questions. Is this a new build or a rebuild on an existing lot? How close is the home to the shoreline? How steep is the ground? Moisture exposure is also a standard concern near water, so materials and detailing for siding, windows, decks and crawl spaces deserve early attention. Views often drive the floor plan, and that affects structure and window choices.
Shoreline takes building permit applications online through the city's eTRAKiT portal at permits.shorelinewa.gov. The city says all applications move to MyBuildingPermit.com starting 2027. If your project will be filed near that change, ask which system applies to your submission date. We prepare and file the permit application for permitted work, so you do not have to learn the portal yourself.
Expect the early phase to be mostly design, site review and paperwork. Visible construction follows once approvals are in place.
Practical tip: gather any survey, plans or property records you already have, and note where water pools or runs on your lot after heavy rain. That information helps the first planning conversation.
A residential city directly north of Seattle between Puget Sound and Lake Forest Park.
Expertise with shoreline permits and critical-areas rules; Foundations engineered for waterfront soils and flood levels; Corrosion-resistant materials for salt and moisture exposure; Designs that maximize water views and light; Drainage built for high water tables and runoff